Home | Register | Contact | Verify Email | FAQ |
Blogs | Photo Gallery | Press Release | Results | HoseheadsClassifieds.com


Welcome Guest. Already registered? Please Login

 
Blogs


Submit a New Blog
Zenith Machinery Expatiates on the Installation and Maintenance of Ultrafine Mill
Blog Submitted by sbmcrusher on 04/18/2018 at 3:02 AM Report Blog
Zenith team has sent a technician to explain the relevant installation and maintenance skills about ultrafine mill when serving a potential customer recently. Installation and trial run: 1. This machine should be fixed with bolt on the basis of horizontal concrete. 2. The main body should be vertical with the horizontal level when installed. 3. Check whether the bolts of various parts and the bin gate of main body are loose or not. If loose, please fasten it. 4. The power line and controlling switch should be installed according to the motor equipment. 5. Trial run should be started without load. If it is normal, products can be manufactured successfully. Machine maintenance: 1. Fine lubrication function has great relationship with the service life of bearing and rotation rate because the bearing undertakes the whole load of crusher. Consequently, the lubricating oil must be clean enough and seal must be excellent. 2. It is necessary to check the newly installed tyre because it is easily loose. 3. Take notice of each part of machine whether it works normally or not 4. Keep an eye on the attrition rate of the easy wear part and replace the wear part timely. 5. If the temperature of bearing oil is too high, machine should be stopped to eliminate the phenomenon. 6. If there is impact sound when rolling gear is operating, machine should be stopped to be checked.
Blog Reply
You must be logged in to Post a Reply.
Not a member. Register Here.
Already registered? Please Login




 

If you have a website and would like to set up a forum here at HoseHeadForums.com
please contact us by using the contact link at the top of the page.

© 2024 HoseHeadForums.com Privacy Policy